METAIRIE, La. — Starting Monday (May 3) two lanes of Airline Drive and one lane of the Causeway Blvd. overpass will be closed daily between 9 a.m. and 3 p.m.
Motorists will merge to the right lanes in each direction while closure is in effect.
The closure is necessary for the inspection of the existing bridge sub-structure as part of a $12.51 million-dollar project.
Work is scheduled to be completed by Friday, May 7, at 3 p.m., weather permitting.
For more information, please contact Angela DeSoto, Director, Engineering Department, at 504-736-6500.