This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.
NEW ORLEANS – Based on the current forecast, the U.S. Army Corps of Engineers is delaying operation of the Morganza Floodway until June 6.
The floodway was originally scheduled to open on June 2.
The Mississippi River is predicted to reach 60 ft. at the structure on June 9, instead of the previously forecasted June 5.
The Army Corps of Engineers only intends to operate the structure when needed as to not put additional water into the Atchafalaya Basin.
We will continue to monitor the forecast daily.